RAD Data comm 100 Spezifikationen Seite 74

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 318
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 73
Chapter 2 Installation and Setup Installation and Operation Manual
2-8 Connecting to Power Egate-100 Ver. 4.0
The green power indicator(s) on the power supply turns off.
2. Disconnect power cables as follows:
AC power supply: Disconnect the power cable.
DC power supply: Remove the cable screws connected to the hex nuts on
the PS panel.
3. Using a flathead screwdriver, loosen the two tightening screws that secure
the unit to the chassis.
4. Carefully pull and remove the power supply from the chassis.
5. Slide the new power supply into its slot until the unit is firmly in place.
6. Secure the new power supply unit with the two tightening screws as follows:
DC power supply: Lock the DC connector by inserting the two
locking-cable screws into the hex nuts on the power supply panel.
AC power supply: Connect the power cable connector to the power
supply.
Figure
2-8. AC Power Supply Unit
Seitenansicht 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 317 318

Kommentare zu diesen Handbüchern

Keine Kommentare