
Chapter 2 Installation and Setup Installation and Operation Manual
2-2 Required Equipment Egate-100 Ver. 4.0
2.2 Package Contents
The Egate-100 package contains:
• Egate-100 unit
• SFP modules (if ordered)
• AC power cord (for AC option)
• DC connection kit (for DC option)
• CBL-DB9F-DB9M-STR straight cable for ASCII terminal connection (if ordered)
• RM-34 (if ordered) for mounting one Egate-100 unit in a 19-inch rack
• WM-34 (if ordered) for mounting one Egate-100 unit on the wall.
2.3 Required Equipment
Egate-100 requires no special tools for installation. You need a screwdriver to
mount Egate-100 in a 19-inch rack. You need a screwdriver and drill to mount
Egate-100 on the wall.
Removing/installing the hot-swappable AC/DC units requires a flathead
screwdriver.
Egate-100 comes equipped with an appropriate (country or region dependent)
power cord to be connected from the power socket to the mains.
Refer to
Table
2-1
to determine which cables and connectors are required for
installation.
Table
2-1. Required Connectors
Interface Cable/Connector
Control port Straight RS-232/V.24 cable with DB-9 male connector
for ASCII terminal
Fast Ethernet management
port
RJ-45, 8-pin connector
SDH/SONET interfaces LC (SFP) fiber optic connector
Channelized T3 interface BNC connector
Gigabit Ethernet interfaces Electrical: RJ-45, 8-pin connector
Optical: LC (SFP) fiber optic connector
Kommentare zu diesen Handbüchern