
Installation and Operation Manual Appendix A IR-ETH Ethernet Card
ASM-40CD Ver. 1.0 Installation and Operation A-5
Installing the Hub
To install LRSI-F-14:
1. Insert the LRSI-F-14 module into the upper section of the LRS-24F chassis
above the ASM-40CD module, or into the back section of LRS-24B.
2. Fasten the screws to secure the module to the LRS-24 frame for proper
grounding of the module panel.
Connecting the LRSI-F-14 Module
Table A-2
lists the pinout of the DCE-1/DCE-2 connector of the LRSI-F-14
interface module.
Table A-2. DCE-1/DCE-2 Connector Pinout
Pin ID Function Direction
1 Tx+ Transmit – positive lead Output
2 Tx– Transmit – negative lead Output
3 Rx+ Receive – positive lead Input
4, 5 – Not connected –
6 Rx– Receive – negative lead Input
7, 8 – Not connected –
When connecting LRSI-F-14 to the LAN, use a cross cable for connection to a port
that does not implement the crossover function internally. Otherwise, use a
straight cable.
•
To ensure compliance with electromagnetic compatibility (EMC) requirements,
use only shielded cables when connecting the DTE ports to the LAN.
•
Hubs usually do implement the crossover function internally while NICs and
other devices do not.
LED Indicators
Table A-3
lists the IR-ETH LED indicators and describes their functions.
Table A-3. IR-ETH LED Indicators
LED Name Description Color
INT ON – Good link integrity Green
ACT ON – Data is received from the Ethernet attached
segment or data is transmitted from the
modem to the Ethernet segment
Yellow
ERR
(on-board)
ON – LAN/WAN error Red
Note
Kommentare zu diesen Handbüchern